Corridor Set

From Galaxy Scouts
Jump to: navigation, search

10' Corridor

To Do List

Area Subarea Notes Status
All Bevels everywhere needed Done - but recheck later
Walls Panels flush Panel lines, tool insets for removal; various shapes and sizes
Walls Panels heavy Lower, bolted on; need removed cover as well
Walls Info displays How often, how many?
Walls Rigg's repair spot
  • Removed panel
  • Removal tool
  • Widgets
  • Lighting
Walls Vents Done
Walls Floor lights Done - but recheck materials
Floor Central access NOT an open grate that everything falls through :)
Floor Alternate intersections (e.g. near lift)
Floor Panel lines Done - but recheck accent color placement
Floor Baffle floor Door tracks etc. Rebuild?
Baffle Controls / details
Baffle Bulkhead Grid insets Done
Baffle Bulkhead extension window
Baffle Bulkhead Rigging for animation
Baffle Bulkhead Energy field how? (Clay's across/up idea still works?)
Baffle Simplified Version without bulkhead / emitter?
Door section Frame Rebuild it smarter
Door section Walls
Door section Lighting
Door section Wall display
Door section Controls
Door section Rigging for animation
Lift entrance Frame
Lift entrance Walls
Lift entrance Lighting
Lift entrance Wall display
Lift entrance Controls
Lift entrance Rigging for animation
Ceiling Alternate cutouts (e.g. near lifts)
Ceiling Beams? Hatch?
Ceiling Lights better integrated
Miscellaneous Emergency Station
Miscellaneous Other one-off details
Decals Names / numbering

Other Thoughts

  • What would puppets do differently from a standard sci-fi corridor?
  • Access hatch ("Jeffries tube entry")?
  • Pipes and cables where?